The body is back off again, but for good reason - we need to create a bit more room to sit and need a bit more strength than this re-purposed frame provides currently. Again, I have the cast of characters John (aka dub) & Mark (aka the hippie, wicked hair, etc) who came by to join in on the fun.
When mark took off it was up to John and I to turn this into a complete debacle, however for some reason we made damn good progress albeit into the wee hours of the morning. John spent most of his time grinding & cutting I was busy finishing up welding, bracing and moving the shock mounts.
Dec 11, 2009
Dec 10, 2009
Body, frame - frame, body
The 2 met for the first time the other night when John came by and we decided it was time to cut some more then see what it looked like. After cutting a bit out for the firewall, blowing a fuse and moving some old steel we got it sitting on the frame - most of it that is.
The back half still needs to be cut for the wheel wells and its not sitting as it should, just propped up on jack stands but the firewall is pretty much good to go.
Mark will be over tonight to undo what we have done :)
The back half still needs to be cut for the wheel wells and its not sitting as it should, just propped up on jack stands but the firewall is pretty much good to go.
Mark will be over tonight to undo what we have done :)
Dec 8, 2009
Tranny stripping
Yeah, you've spent too much time on the internet... However, we are talking about transmission paint stripping here. There was a few layers of paint & primer on the transmission that needed to go. I am just going to clean up the case and paint all steel parts and hardware. This update also includes a bit more cleanup, some griding, welding, cutting and of course more parts removal.
Dec 2, 2009
A real cut up
It was better than the the Catalina wine mixer - John, remember that Joke from when we worked on Mark's hotrod? I bet you do.
This was a last minute decision to start the cutting, John was already planning on coming by so I rang up Mark and Chris as well. Mark had to leave a little early so I had to resume my duty as master welder (of course). We spent the night measuring, welding, cutting, and just having a great time. The run Shannon made to Taco Bell for us didn't hurt either. The pics tell the story, but I will narrate a bit.
John inside the A lining up the doors, Mark tacking them to the body.
Chris & John measuring up the chop lines, or rather John putting down tape and Chris making sure its reasonable. Luckily, I kept the calipers away from Chris so he had to accept some old school tolerances.
Two vertical cuts were made, the last had the car shaking a bit with the Sawz-All so I finished up with the plasma cutter.
And the re-joining of steel. The seams actually do line up, I didn't snap a pic of it clamped together but everything is within range, just some tweaking and welding before we get to do the roof chop. I will probably be cleaning up the shop again next the working on the frame.
This was a last minute decision to start the cutting, John was already planning on coming by so I rang up Mark and Chris as well. Mark had to leave a little early so I had to resume my duty as master welder (of course). We spent the night measuring, welding, cutting, and just having a great time. The run Shannon made to Taco Bell for us didn't hurt either. The pics tell the story, but I will narrate a bit.
John inside the A lining up the doors, Mark tacking them to the body.
Chris & John measuring up the chop lines, or rather John putting down tape and Chris making sure its reasonable. Luckily, I kept the calipers away from Chris so he had to accept some old school tolerances.
Two vertical cuts were made, the last had the car shaking a bit with the Sawz-All so I finished up with the plasma cutter.
And the re-joining of steel. The seams actually do line up, I didn't snap a pic of it clamped together but everything is within range, just some tweaking and welding before we get to do the roof chop. I will probably be cleaning up the shop again next the working on the frame.
3..2..1.. Lift off
Dec 1, 2009
It's sectioned
Just finished the section tonight with John, Mark & Chris. Great times, it still needs to be welded back together but I can start to realize the vision a bit more. Many pics to post tomorrow.
My minions
A little more work last night, removed some more brackets, gauge fittings, brake pedal, body mounts and the headers. I had some help, probably not OSHA (or Dept of labor) approved but hey, they enjoyed it. :)
It's nice to have the kids out there helping, especially with heat out there this year. We all had fun and will have some great memories this summer when we hit some of the local shows in a car they helped build.
It's nice to have the kids out there helping, especially with heat out there this year. We all had fun and will have some great memories this summer when we hit some of the local shows in a car they helped build.
Subscribe to:
Posts (Atom)